Suivre
Nima Hamta
Nima Hamta
Assistant Professor, Arak University of Technology, PhD in Industrial Engineering
Adresse e-mail validée de aut.ac.ir
Titre
Citée par
Citée par
Année
A hybrid PSO algorithm for a multi-objective assembly line balancing problem with flexible operation times, sequence-dependent setup times and learning effect
N Hamta, SMT Fatemi Ghomi, F Jolai, M Akbarpour Shirazi
International Journal of Production Economics 141 (1), 99-111, 2013
2202013
Bi-criteria assembly line balancing by considering flexible operation times
N Hamta, SMT Fatemi Ghomi, F Jolai, U Bahalke
Applied Mathematical Modelling 35 (12), 5592-5608, 2011
612011
Supply chain network optimization considering assembly line balancing and demand uncertainty
N Hamta, M Akbarpour Shirazi, SMT Fatemi Ghomi, S Behdad
International Journal of Production Research 53 (10), 2970-2994, 2015
462015
Presenting a goal programming model in the time-cost-quality trade-off
N Hamta, M Ehsanifar, J Sarikhani
International Journal of Construction Management 21 (1), 1-11, 2021
322021
Predictive modeling techniques to forecast energy demand in the United States: A focus on economic and demographic factors
A Deka, N Hamta, B Esmaeilian, S Behdad
Journal of Energy Resources Technology 138 (2), 022001, 2016
302016
Modeling and measuring the structural complexity in assembly supply chain networks
N Hamta, M Akbarpour Shirazi, S Behdad, SMT Fatemi Ghomi
Journal of Intelligent Manufacturing, 1-17, 2015
212015
Improving the Identification and prioritization of the most important risks of safety equipment in FMEA with a hybrid multiple criteria decision-making technique
N Hamta, M Ehsanifar, A Babai, A Biglar
Journal of applied research on industrial engineering 8 (Special Issue), 1-16, 2021
152021
A bi-level programming model for supply chain network optimization with assembly line balancing and push–pull strategy
N Hamta, M Akbarpour Shirazi, SMT Fatemi Ghomi
Proceedings of the Institution of Mechanical Engineers, Part B: Journal of …, 2016
112016
A hybrid metaheuristic for balancing and scheduling the assembly lines with sequence-independent setup times by considering deterioration tasks and learning effect
N Hamta, SMT Fatemi Ghomi, R Tavakkoli-Moghaddam, F Jolai
Scientia Iranica, Transactions E: Industrial Engineering 21 (3), 963-979, 2014
112014
A simulation approach to evaluate performance indices of fuzzy exponential queuing system (An M/M/C model in a banking case study)
M Ehsanifar, N Hamta, M Hemesy
Journal of Industrial Engineering and Management Studies 4 (2), 35-51, 2017
102017
Integration of liability payment and new funding entries in the optimal design of a supply chain network
A Biglar, N Hamta, M Ahmadi Rad
Advances in Mathematical Finance and Applications 7 (3), 715-740, 2022
82022
A new heuristic algorithm for multi vehicle routing problem with and/or-type precedence constraints and hard time windows
U Bahalke, N Hamta, AR Shojaeifard, M Alimoradi, S Rabiee
Operational Research in Engineering Sciences: Theory and Applications 5 (2 …, 2022
82022
Multi-objective Assembly Line Balancing Problem with Bounded Processing Times, Learning Effect, and Sequence-Dependent Setup Times
N Hamta, SMT Fatemi Ghomi, Hakimi-Asiabar M, P Hooshangi Tabrizi
Industrial Engineering and Engineering Management (IEEM), IEEE International …, 2011
8*2011
Optimization in supply chain design of assembled products: a case study of HEPCO company
N Hamta, M Ehsanifar, A Biglar
Iranian Journal of Management Studies 16 (1), 61-77, 2023
72023
A novel bi-level stochastic programming model for supply chain network design with assembly line balancing under demand uncertainty
N Hamta, M Akbarpour Shirazi, S Behdad, M Ehsanifar
Journal of Industrial and Systems Engineering 10 (2), 2017
72017
Optimal hospital location using combined approach of GIS and ANP under fuzzy environment (Case Study in Arak City)
M Ehsanifar, N Hamta, M Saghari
Journal of Structural and Construction Engineering 8 (6), 301-324, 2021
62021
A Mathematical Programming Approach to Supply Chain Network Design considering Shareholder Value Creation
A Biglar, N Hamta, MA Rad
Discrete Dynamics in Nature and Society 2022, 2022
32022
Presenting a new model in discrete time-cost trade-off problem of project with budget constraints
N Hamta, M Ehsanifar, A Moghaddasi
Modern Research in Decision Making 2 (4), 255-273, 2018
3*2018
SINGLE MACHINE SCHEDULING PROBLEM WITH PRECEDENCE CONSTRAINTS AND DETERIORATING JOBS
N Hamta, SMT Fatemi Ghomi, U Bahalke, HR Golpaigani
International Journal of Engineering-Transactions A: Basics 24 (2), 115, 2011
3*2011
Assessing Credit Risk in the Banking System Using Data Mining Techniques
N Hamta, M Ehsanifar, B Mohammadi
Journal of Development & Evolution Mnagement 10 (special issue), 141-150, 2019
22019
Le système ne peut pas réaliser cette opération maintenant. Veuillez réessayer plus tard.
Articles 1–20