Type II robotic assembly line balancing problem: An evolution strategies algorithm for a multi-objective model A Yoosefelahi, M Aminnayeri, H Mosadegh, HD Ardakani Journal of Manufacturing Systems 31 (2), 139-151, 2012 | 89 | 2012 |
Scheduling open shops with parallel machines to minimize total completion time B Naderi, SMTF Ghomi, M Aminnayeri, M Zandieh Journal of Computational and Applied Mathematics 235 (5), 1275-1287, 2011 | 69 | 2011 |
A high performing metaheuristic for job shop scheduling with sequence-dependent setup times B Naderi, SMTF Ghomi, M Aminnayeri Applied Soft Computing 10 (3), 703-710, 2010 | 65 | 2010 |
Solving the integrated scheduling of production and rail transportation problem by Keshtel algorithm M Hajiaghaei-Keshteli, M Aminnayeri Applied Soft Computing 25, 184-203, 2014 | 62 | 2014 |
Integrated scheduling of production and rail transportation M Hajiaghaei-Keshteli, M Aminnayeri, SMTF Ghomi Computers & Industrial Engineering 74, 240-256, 2014 | 53 | 2014 |
Incorporating periodic preventive maintenance into flexible flowshop scheduling problems B Naderi, M Zandieh, M Aminnayeri Applied Soft Computing 11 (2), 2094-2101, 2011 | 49 | 2011 |
A contribution and new heuristics for open shop scheduling B Naderi, SMTF Ghomi, M Aminnayeri, M Zandieh Computers & Operations Research 37 (1), 213-221, 2010 | 43 | 2010 |
Keshtel Algorithm (KA); a new optimization algorithm inspired by Keshtels’ feeding M Hajiaghaei-Keshteli, M Aminnayeri Proceeding in IEEE conference on industrial engineering and management …, 2013 | 33 | 2013 |
Comparison of different input selection algorithms in neuro-fuzzy modeling M Alizadeh, F Jolai, M Aminnayeri, R Rada Expert Systems with Applications 39 (1), 1536-1544, 2012 | 27 | 2012 |
Multi-objective no-wait flowshop scheduling problems: models and algorithms B Naderi, M Aminnayeri, M Piri, MH Ha'iri Yazdi International Journal of Production Research 50 (10), 2592-2608, 2012 | 25 | 2012 |
An MLE approach for estimating the time of step changes in Poisson regression profiles A Sharafi, M Aminnayeri, A Amiri Scientia Iranica 20 (3), 855-860, 2013 | 24 | 2013 |
Multistage portfolio optimization with stocks and options H Davari‐Ardakani, M Aminnayeri, A Seifi International Transactions in Operational Research 23 (3), 593-622, 2016 | 22 | 2016 |
A study on open shop scheduling to minimise total tardiness B Naderi, SMT Fatemi Ghomi, M Aminnayeri, M Zandieh International Journal of Production Research 49 (15), 4657-4678, 2011 | 21 | 2011 |
Estimating the Change Point of Binary Profiles with a Linear Trend Disturbance (Quality Engineering Conference Paper) A Sharafi, M Aminnayeri, A Amiri, M Rasouli International Journal of Industrial Engineering & Production Research 24 (2 …, 2013 | 20 | 2013 |
Identifying the time of step change in binary profiles A Sharafi, M Aminnayeri, A Amiri The International Journal of Advanced Manufacturing Technology 63 (1-4), 209-214, 2012 | 20 | 2012 |
Statistical monitoring of polytomous logistic profiles in phase II R Noorossana, M Aminnayeri, H Izadbakhsh Scientia Iranica 20 (3), 958-966, 2013 | 13 | 2013 |
A novel discrete league championship algorithm for minimizing earliness/tardiness penalties with distinct due dates and batch delivery consideration Z Pourali, M Aminnayeri International Conference on Intelligent Computing, 139-146, 2011 | 13 | 2011 |
Modeling and scheduling open shops with sequence-dependent setup times to minimize total completion time B Naderi, SMTF Ghomi, M Aminnayeri, M Zandieh The International Journal of Advanced Manufacturing Technology 53 (5-8), 751-760, 2011 | 13 | 2011 |
Estimating the change point of correlated Poisson count processes E Asghari Torkamani, STA Niaki, M Aminnayeri, M Davoodi Quality Engineering 26 (2), 182-195, 2014 | 9 | 2014 |
Process capability indices for logistic regression profile M Rezaye Abbasi Charkhi, M Aminnayeri, A Amiri Quality and Reliability Engineering International 32 (5), 1655-1661, 2016 | 7 | 2016 |