Hamed Samarghandi
Title
Cited by
Cited by
Year
An efficient tabu algorithm for the single row facility layout problem
H Samarghandi, K Eshghi
European Journal of Operational Research 205 (1), 98-105, 2010
1382010
A particle swarm optimization for the single row facility layout problem
H Samarghandi, P Taabayan, FF Jahantigh
Computers & Industrial Engineering 58 (4), 529-534, 2010
1372010
Studying the reasons for delay and cost overrun in construction projects: The case of Iran
H Samarghandi, SMM Tabatabaei, P Taabayan, A Mirhashemi, ...
Journal of Construction in Developing Countries 21 (1), 51-84, 2016
482016
A meta-heuristic approach for solving the no-wait flow-shop problem
H Samarghandi, TY ElMekkawy
International Journal of Production Research 50 (24), 7313-7326, 2012
462012
A genetic algorithm and particle swarm optimization for no-wait flow shop problem with separable setup times and makespan criterion
H Samarghandi, TY ElMekkawy
The International Journal of Advanced Manufacturing Technology 61 (9-12 …, 2012
252012
A particle swarm optimisation for the no-wait flow shop problem with due date constraints
H Samarghandi
International Journal of Production Research 53 (9), 2853-2870, 2015
232015
An efficient hybrid algorithm for the two-machine no-wait flow shop problem with separable setup times and single server
H Samarghandi, TY ElMekkawy
European Journal of Industrial Engineering 5 (2), 111-131, 2011
232011
Solving the no-wait flow-shop problem with sequence-dependent set-up times
H Samarghandi, TY ElMekkawy
International Journal of Computer Integrated Manufacturing 27 (3), 213-228, 2014
222014
Metaheuristics for fuzzy dynamic facility layout problem with unequal area constraints and closeness ratings
H Samarghandi, P Taabayan, M Behroozi
The International Journal of Advanced Manufacturing Technology 67 (9-12 …, 2013
192013
On the exact solution of the no-wait flow shop problem with due date constraints
H Samarghandi, M Behroozi
Computers & Operations Research 81, 141-159, 2017
172017
Studying the effect of different combinations of timetabling with sequencing algorithms to solve the no-wait job shop scheduling problem
H Samarghandi, TY ElMekkawy, AMM Ibrahem
International Journal of Production Research 51 (16), 4942-4965, 2013
112013
Two-machine, no-wait job shop problem with separable setup times and single-server constraints
H Samarghandi, TY ElMekkawy
The International Journal of Advanced Manufacturing Technology 65 (1-4), 295-308, 2013
112013
Studying the effect of server side-constraints on the makespan of the no-wait flow-shop problem with sequence-dependent set-up times
H Samarghandi
International Journal of Production Research 53 (9), 2652-2673, 2015
92015
Take-back regulation: Remanufacturing or Eco-design?
M Pazoki, H Samarghandi
International Journal of Production Economics 227, 107674, 2020
72020
An Enumeration Algorithm for the No-Wait Flow Shop Problem with Due Date Constraints
H Samarghandi, M Behroozi
IFAC-PapersOnLine 49 (12), 1803-1808, 2016
72016
A particle swarm optimisation for fuzzy dynamic facility layout problem
H Samarghandi, FF Jahantigh
International Journal of Metaheuristics 1 (3), 257-278, 2011
72011
Studying the impact of merged and divided storage policies on the profitability of a remanufacturing system with deteriorating revenues
H Samarghandi
International Journal of Production Economics 193, 160-171, 2017
62017
A no-wait flow shop system with sequence dependent setup times and server constraints
H Samarghandi
IFAC-PapersOnLine 48 (3), 1604-1609, 2015
32015
Studying the Reasons for Delay and Cost Escalation in Construction Projects: The Case of Iran
H Samarghandi, SMM Tabatabaei, P Taabayan, A MirHashemi
IIE Annual Conference. Proceedings, 2847, 2014
32014
Minimizing the makespan in a flow shop environment under minimum and maximum time-lag constraints
H Samarghandi
Computers & Industrial Engineering 136, 614-634, 2019
22019
The system can't perform the operation now. Try again later.
Articles 1–20