Asgeir Tomasgard
Title
Cited by
Cited by
Year
Supply chain design under uncertainty using sample average approximation and dual decomposition
P Schütz, A Tomasgard, S Ahmed
European journal of operational research 199 (2), 409-419, 2009
2472009
An optimization-simulation model for a simple LNG process
A Aspelund, T Gundersen, J Myklebust, MP Nowak, A Tomasgard
Computers & Chemical Engineering 34 (10), 1606-1617, 2010
1742010
Optimization models for the natural gas value chain
A Tomasgard, F Rømo, M Fodstad, K Midthun
Geometric modelling, numerical simulation, and optimization, 521-558, 2007
1112007
Stochastic pooling problem for natural gas production network design and operation under uncertainty
X Li, E Armagan, A Tomasgard, PI Barton
AIChE Journal 57 (8), 2120-2135, 2011
1012011
Prosumer bidding and scheduling in electricity markets
SØ Ottesen, A Tomasgard, SE Fleten
Energy 94, 828-843, 2016
932016
Nonconvex generalized Benders decomposition for stochastic separable mixed-integer nonlinear programs
X Li, A Tomasgard, PI Barton
Journal of optimization theory and applications 151 (3), 425, 2011
872011
The impact of flexibility on operational supply chain planning
P Schütz, A Tomasgard
International Journal of Production Economics 134 (2), 300-311, 2011
842011
Optimizing the Norwegian natural gas production and transport
F Rømo, A Tomasgard, L Hellemo, M Fodstad, BH Eidesen, B Pedersen
Interfaces 39 (1), 46-56, 2009
832009
Optimizing a CO2 value chain for the Norwegian Continental Shelf
Ø Klokk, PF Schreiner, A Pagès-Bernaus, A Tomasgard
Energy policy 38 (11), 6604-6614, 2010
762010
The stochastic single resource service‐provision problem
S Dye, L Stougie, A Tomasgard
Naval Research Logistics (NRL) 50 (8), 869-887, 2003
652003
A stochastic model for scheduling energy flexibility in buildings
SO Ottesen, A Tomasgard
Energy 88, 364-376, 2015
582015
Short-term uncertainty in long-term energy system models—A case study of wind power in Denmark
P Seljom, A Tomasgard
Energy Economics 49, 157-167, 2015
582015
Modeling optimal economic dispatch and system effects in natural gas networks
KT Midthun, M Bjorndal, A Tomasgard
The Energy Journal 30 (4), 2009
572009
Stochastic facility location with general long-run costs and convex short-run costs
P Schütz, L Stougie, A Tomasgard
Computers & Operations Research 35 (9), 2988-3000, 2008
522008
Power generation planning and risk management in a liberalised market
T Bjorkvoll, SE Fleten, MP Nowak, A Tomasgard, SW Wallace
2001 IEEE Porto Power Tech Proceedings (Cat. No. 01EX502) 1, 6 pp. vol. 1, 2001
522001
Natural gas cash-out problem: Bilevel stochastic optimization approach
VV Kalashnikov, GA Pérez-Valdés, A Tomasgard, NI Kalashnykova
European Journal of Operational Research 206 (1), 18-33, 2010
462010
Multi-horizon stochastic programming
M Kaut, KT Midthun, AS Werner, A Tomasgard, L Hellemo, M Fodstad
Computational Management Science 11 (1-2), 179-193, 2014
442014
Decomposition strategy for the stochastic pooling problem
X Li, A Tomasgard, PI Barton
Journal of Global Optimization 54 (4), 765-790, 2012
442012
Linepack storage valuation under price uncertainty
Ø Arvesen, V Medbø, SE Fleten, A Tomasgard, S Westgaard
Energy 52, 155-164, 2013
432013
Modelling aspects of distributed processingin telecommunication networks
A Tomasgard, JA Audestad, S Dye, L Stougie, MH van der Vlerk, ...
Annals of Operations Research 82, 161-185, 1998
411998
The system can't perform the operation now. Try again later.
Articles 1–20