SangHyun Lee
TitleCited byYear
Visualization of construction progress monitoring with 4D simulation model overlaid on time-lapsed photographs
M Golparvar-Fard, F Peņa-Mora, CA Arboleda, SH Lee
Journal of computing in civil engineering 23 (6), 391-404, 2009
2272009
A vision-based motion capture and recognition framework for behavior-based safety management
SU Han, SH Lee
Automation in Construction 35, 131-141, 2013
1782013
An integrated system for change management in construction
IA Motawa, CJ Anumba, S Lee, F Peņa-Mora
Automation in construction 16 (3), 368-377, 2007
1652007
Generating construction schedules through automatic data extraction using open BIM (building information modeling) technology
H Kim, K Anderson, SH Lee, J Hildreth
Automation in Construction 35, 285-295, 2013
1392013
Computer vision techniques for construction safety and health monitoring
JO Seo, SU Han, SH Lee, H Kim
Advanced Engineering Informatics 29 (2), 239-251, 2015
1362015
Dynamic planning and control methodology for strategic and operational construction project management
SH Lee, F Peņa-Mora, M Park
Automation in construction 15 (1), 84-97, 2006
1312006
Quality and change management model for large scale concurrent design and construction projects
SH Lee, F Peņa-Mora, M Park
Journal of Construction Engineering and Management 131 (8), 890-902, 2005
1242005
RFID-based real-time locating system for construction safety management
HS Lee, KP Lee, M Park, Y Baek, SH Lee
Journal of Computing in Civil Engineering 26 (3), 366-377, 2011
1142011
Strategic-operational construction management: Hybrid system dynamics and discrete event approach
F Peņa-Mora, S Han, SH Lee, M Park
Journal of Construction Engineering and Management 134 (9), 701-710, 2008
832008
Toward an Understanding of the Impact of Production Pressure on Safety Performance in Construction Operations
SU Han, F Saba, SH Lee, Y Mohamed, F Pena-Mora
Accident Analysis and Prevention, 2013
802013
A framework for an automated and integrated project monitoring and control system for steel fabrication projects
R Azimi, SH Lee, SM AbouRizk, A Alvanchi
Automation in Construction 20 (1), 88-97, 2011
702011
Modeling framework and architecture of hybrid system dynamics and discrete event simulation for construction
A Alvanchi, SH Lee, S AbouRizk
Computer‐Aided Civil and Infrastructure Engineering 26 (2), 77-91, 2010
692010
Vision-based detection of unsafe actions of a construction worker: Case study of ladder climbing
SU Han, SH Lee, F Peņa-Mora
Journal of Computing in Civil Engineering 27 (6), 635-644, 2012
662012
Reliability and stability buffering approach: Focusing on the issues of errors and changes in concurrent design and construction projects
SH Lee, F Peņa-Mora, M Park
Journal of construction engineering and management 132 (5), 452-464, 2006
632006
Identification and Quantification of Non-Value-Adding Effort from Errors and Changes in Design and Construction Projects
S Han, SH Lee, F Peņa-Mora
Journal of Construction Engineering and Management 138 (1), 98-109, 2011
572011
Impact of Social Network Type and Structure on Modeling Normative Energy Use Behavior Interventions
K Anderson, SH Lee, CC Menassa
Journal of Computing in Civil Engineering, 2013
492013
Toward environmentally sustainable construction processes: The US and Canada’s perspective on energy consumption and GHG/CAP emissions
C Ahn, SH Lee, F Peņa-Mora, S Abourizk
Sustainability 2 (1), 354-370, 2010
492010
Visualization, information modeling, and simulation: Grand challenges in the construction industry
F Leite, Y Cho, AH Behzadan, SH Lee, S Choe, Y Fang, R Akhavian, ...
Journal of Computing in Civil Engineering 30 (6), 04016035, 2016
462016
Effects of workers’ social learning: Focusing on absence behavior
S Ahn, SH Lee, RP Steel
Journal of Construction Engineering and Management 139 (8), 1015-1025, 2013
452013
Motion data-driven biomechanical analysis during construction tasks on sites
JO Seo, R Starbuck, SU Han, SH Lee, TJ Armstrong
Journal of Computing in Civil Engineering 29 (4), B4014005, 2014
442014
The system can't perform the operation now. Try again later.
Articles 1–20