Follow
Mohammad Mohammadi
Mohammad Mohammadi
Associate professor, Department of Industrial Engineering, Faculty of Engineering, Kharazmi
Verified email at khu.ac.ir - Homepage
Title
Cited by
Cited by
Year
Scheduling flexible job-shops with transportation times: Mathematical models and a hybrid imperialist competitive algorithm
S Karimi, Z Ardalan, B Naderi, M Mohammadi
Applied mathematical modellíng 41, 667-682, 2017
1532017
Mixed robust possibilistic flexible chance constraint optimization model for emergency blood supply chain network design
M Fazli-Khalaf, S Khalilpourazari, M Mohammadi
Annals of operations research 283 (1), 1079-1109, 2019
1262019
Rolling-horizon and fix-and-relax heuristics for the multi-product multi-level capacitated lotsizing problem with sequence-dependent setups
M Mohammadi, SMT Fatemi Ghomi, B Karimi, SA Torabi
Journal of Intelligent Manufacturing 21, 501-510, 2010
952010
New robust optimization models for closed-loop supply chain of durable products: Towards a circular economy
MS Atabaki, M Mohammadi, B Naderi
Computers & industrial engineering 146, 106520, 2020
822020
A novel approach for considering layout problem in cellular manufacturing systems with alternative processing routings and subcontracting approach
M Mohammadi, K Forghani
Applied Mathematical Modelling 38 (14), 3624-3640, 2014
752014
Designing cellular manufacturing systems considering S-shaped layout
M Mohammadi, K Forghani
Computers & Industrial Engineering 98, 221-236, 2016
722016
Optimization of rewards in single machine scheduling in the rewards-driven systems
A Gharaei, B Naderi, M Mohammadi
Management Science Letters 5 (6), 629-638, 2015
682015
A priority-based firefly algorithm for network design of a closed-loop supply chain with price-sensitive demand
MS Atabaki, AA Khamseh, M Mohammadi
Computers & industrial engineering 135, 814-837, 2019
492019
Hybrid flexible flowshop scheduling problem with unrelated parallel machines and limited waiting times
SF Attar, M Mohammadi, R Tavakkoli-Moghaddam
The International Journal of Advanced Manufacturing Technology 68, 1583-1599, 2013
462013
MIP-based heuristics for lotsizing in capacitated pure flow shop with sequence-dependent setups
M Mohammadi, SMT Fatemi Ghomi, B Karimi, SA Torabi
International Journal of Production Research 48 (10), 2957-2973, 2010
422010
The design of a resilient and sustainable maximal covering closed-loop supply chain network under hybrid uncertainties: a case study in tire industry
M Fazli-Khalaf, B Naderi, M Mohammadi, MS Pishvaee
Environment, Development and Sustainability 23, 9949-9973, 2021
412021
A genetic algorithm for the simultaneous lot sizing and scheduling problem in capacitated flow shop with complex setups and backlogging
M Babaei, M Mohammadi, SMTF Ghomi
The International Journal of Advanced Manufacturing Technology 70, 125-134, 2014
382014
A new algorithmic approach for capacitated lot-sizing problem in flow shops with sequence-dependent setups
M Mohammadi, SA Torabi, SMT Fatemi Ghomi, B Karimi
The International Journal of Advanced Manufacturing Technology 49, 201-211, 2010
372010
Design of a sustainable and reliable hydrogen supply chain network under mixed uncertainties: A case study
M Fazli-Khalaf, B Naderi, M Mohammadi, MS Pishvaee
International journal of hydrogen energy 45 (59), 34503-34531, 2020
362020
Reliable multi period multi product supply chain design with facility disruption
M Rafiei, M Mohammadi, S Torabi
Decision Science Letters 2 (2), 81-94, 2013
362013
Reformulation, linearization, and a hybrid iterated local search algorithm for economic lot-sizing and sequencing in hybrid flow shop problems
H Zohali, B Naderi, M Mohammadi, V Roshanaei
Computers & Operations Research 104, 127-138, 2019
352019
Optimization of closed-loop Supply chain network design: a Water Cycle Algorithm approach
S Khalilpourazari, M Mohammadi
2016 12th international conference on industrial engineering (ICIE), 41-45, 2016
352016
Solving a new multi-objective hybrid flexible flowshop problem with limited waiting times and machine-sequence-dependent set-up time constraints
SF Attar, M Mohammadi, R Tavakkoli-Moghaddam, S Yaghoubi
International Journal of Computer Integrated Manufacturing 27 (5), 450-469, 2014
332014
Genetic algorithm-based heuristic for capacitated lotsizing problem in flow shops with sequence-dependent setups
M Mohammadi, SMTF Ghomi
Expert systems with applications 38 (6), 7201-7207, 2011
332011
A De Novo programming approach for a robust closed-loop supply chain network design under uncertainty: An M/M/1 queueing model
S Saeedi, M Mohammadi, S Torabi
International journal of industrial engineering computations 6 (2), 211-228, 2015
302015
The system can't perform the operation now. Try again later.
Articles 1–20