Bilevel programming problems S Dempe, V Kalashnikov, GA Pérez-Valdés, N Kalashnykova Energy Systems. Springer, Berlin, 2015 | 216 | 2015 |
Bilevel programming problems S Dempe, V Kalashnikov, GA Pérez-Valdés, N Kalashnykova Energy Systems. Springer, Berlin, 2015 | 202 | 2015 |
Bilevel programming and applications VV Kalashnikov, S Dempe, GA Pérez-Valdés, NI Kalashnykova, ... Mathematical Problems in Engineering 2015, 2015 | 86 | 2015 |
Natural gas cash-out problem: bilevel stochastic optimization approach VV Kalashnikov, GA Pérez-Valdés, A Tomasgard, NI Kalashnykova European Journal of Operational Research 206 (1), 18-33, 2010 | 50 | 2010 |
A multi-horizon stochastic programming model for the European power system C Skar, G Doorman, GA Pérez-Valdés, A Tomasgard Subimtted to an international peer reviewed journal, In review, 2016 | 23 | 2016 |
Natural gas bilevel cash-out problem: convergence of a penalty function method S Dempe, VV Kalashnikov, GA Pérez-Valdés, NI Kalashnykova European Journal of Operational Research 215 (3), 532-538, 2011 | 19 | 2011 |
Time series analysis applied to construct US natural gas price functions for groups of states VV Kalashnikov, TI Matis, GA Pérez-Valdés Energy Economics 32 (4), 887-900, 2010 | 19 | 2010 |
Investment analysis of an integrated industrial park with carbon capture K Midthun, VS Nørstebø, G Pérez-Valdés, T Bjørkvoll Journal of Natural Gas Science and Engineering 7, 44-51, 2012 | 18 | 2012 |
A parallelised distributed implementation of a branch and fix coordination algorithm A Pagès-Bernaus, G Pérez-Valdés, A Tomasgard European Journal of Operational Research 244 (1), 77-85, 2015 | 13 | 2015 |
Stochastic MIP modeling of a natural gas-powered industrial park G Pérez-Valdés, M Kaut, V Nørstebø, K Midthun Energy Procedia 26, 74-81, 2012 | 12 | 2012 |
Hydropower bidding in a multi-market setting EK Aasgård, SE Fleten, M Kaut, K Midthun, GA Perez-Valdes Energy Systems 10 (3), 543-565, 2019 | 9 | 2019 |
Mixed-integer bilevel programming: application to an extended gas cash-out problem S Dempe, VV Kalashnikov, GA Pérez-Valdés Proceedings of the International Business and Economics Research Conference …, 2006 | 6 | 2006 |
Development of a Norwegian open-source plug-and-abandonment database with applications V Myrseth, GA Perez-Valdes, SJ Bakker, KT Midthun, M Torsæter SPE Economics & Management 9 (01), 27-31, 2017 | 5 | 2017 |
REMES-a regional equilibrium model for Norway with focus on the energy system A Werner, GA Perez-Valdes, U Johansen, A Stokka SINTEF Rapport, 2017 | 4 | 2017 |
Norwegian open source P&A database V Myrseth, GA Perez-Valdes, SJ Bakker, KT Midthun, M Torsæter SPE Bergen one day seminar, 2016 | 3 | 2016 |
US natural gas market classification using pooled regression VV Kalashnikov, GA Pérez-Valdés, TI Matis, NI Kalashnykova Mathematical Problems in Engineering 2014, 2014 | 2 | 2014 |
Reduction of Dimension of the Upper Level Problem in a Bilevel Programming Model Part 1 VV Kalashnikov, S Dempe, GA Pérez-Valdés, NI Kalashnykova Intelligent Decision Technologies, 255-264, 2011 | 2 | 2011 |
Identifying Suitable Bioeconomic Cluster Sites—Combining GIS-MCDA and Operational Research Methods V Nørstebø, SO Krøgli, M Debella-Gilo, GA Perez-Valdes, KT Uggen, ... Environmental Modeling & Assessment, 1-15, 2020 | 1 | 2020 |
Veikart for energi i Norge mot 2050 LE Schäffer, E Rosenberg, P Pisciella, S Damman, KA Espegren, ... SINTEF Rapport, 2020 | 1 | 2020 |
Bioeconomic Clusters—Background, Emergence, Localization and Modelling GA Perez-Valdes, VS Nørstebø, MB Ellingsen, J Teräs, AT Werner Sustainability 11 (17), 4611, 2019 | 1 | 2019 |