Simaan Abourizk
Simaan Abourizk
Verified email at ualberta.ca
TitleCited byYear
Project management: techniques in planning and controlling construction projects
HN Ahuja, SP Dozzi, SM AbouRizk
John Wiley & Sons, 1994
3841994
Role of simulation in construction engineering and management
S AbouRizk
Journal of construction engineering and management 136 (10), 1140-1153, 2010
2252010
Simphony: an environment for building special purpose construction simulation tools
D Hajjar, S AbouRizk
Proceedings of the 31st conference on Winter simulation: Simulation---a …, 1999
2081999
Soil–water characteristic curve variability
CE Zapata, WN Houston, SL Houston, KD Walsh
Advances in unsaturated geotechnics, 84-124, 2000
204*2000
Unified modeling methodology for construction simulation
D Hajjar, SM AbouRizk
Journal of Construction Engineering and Management 128 (2), 174-185, 2002
1982002
Utility-theory model for bid markup decisions
SP Dozzi, SM AbouRizk, SL Schroeder
Journal of construction Engineering and Management 122 (2), 119-124, 1996
1761996
Early contractor involvement in design and its impact on construction schedule performance
L Song, Y Mohamed, SM AbouRizk
Journal of Management in Engineering 25 (1), 12-20, 2009
1662009
A framework for applying simulation in construction
SM AbouRizk, D Hajjar
Canadian journal of civil engineering 25 (3), 604-617, 1998
1601998
Statistical properties of construction duration data
SM AbouRizk, DW Halpin
Journal of Construction Engineering and Management 118 (3), 525-544, 1992
1541992
Neural network model for estimating construction productivity
J Portas, S AbouRizk
Journal of construction engineering and management 123 (4), 399-410, 1997
1391997
Fitting beta distributions based on sample data
SM AbouRizk, DW Halpin, JR Wilson
Journal of Construction Engineering and Management 120 (2), 288-305, 1994
1351994
Productivity in construction
SP Dozzi, SM AbouRizk
Institute for Research in Construction, National Research Council, 1993
1331993
Risk-based life-cycle costing of infrastructure rehabilitation and construction alternatives
O Salem, S AbouRizk, S Ariaratnam
Journal of Infrastructure Systems 9 (1), 6-15, 2003
1262003
Resource-based modeling for construction simulation
J Shi, SM AbouRizk
Journal of construction engineering and management 123 (1), 26-33, 1997
1201997
Measuring and modeling labor productivity using historical data
L Song, SM AbouRizk
Journal of Construction Engineering and Management 134 (10), 786-794, 2008
1182008
Estimating labor production rates for industrial construction activities
S AbouRizk, P Knowles, UR Hermann
Journal of construction engineering and management 127 (6), 502-511, 2001
1122001
Simphony-An integrated environment for construction simulation
S AbouRizk, Y Mohamed
2000 Winter Simulation Conference Proceedings (Cat. No. 00CH37165) 2, 1907-1914, 2000
1112000
Visual interactive fitting of beta distributions
SM AbouRizk, DW Halpin, JR Wilson
Journal of Construction Engineering and Management 117 (4), 589-605, 1991
1071991
Research in modeling and simulation for improving construction engineering operations
S AbouRizk, D Halpin, Y Mohamed, U Hermann
Journal of Construction Engineering and Management 137 (10), 843-852, 2011
1062011
Developing a knowledge management system for improved value engineering practices in the construction industry
X Zhang, X Mao, SM AbouRizk
Automation in construction 18 (6), 777-789, 2009
1032009
The system can't perform the operation now. Try again later.
Articles 1–20