Simaan Abourizk
Simaan Abourizk
Verified email at ualberta.ca
TitleCited byYear
Project management: techniques in planning and controlling construction projects
HN Ahuja, SP Dozzi, SM AbouRizk
John Wiley & Sons, 1994
3921994
Role of simulation in construction engineering and management
S AbouRizk
Journal of construction engineering and management 136 (10), 1140-1153, 2010
2362010
Soil–water characteristic curve variability
CE Zapata, WN Houston, SL Houston, KD Walsh
Advances in unsaturated geotechnics, 84-124, 2000
211*2000
Simphony: an environment for building special purpose construction simulation tools
D Hajjar, S AbouRizk
Proceedings of the 31st conference on Winter simulation: Simulation---a …, 1999
2091999
Unified modeling methodology for construction simulation
D Hajjar, SM AbouRizk
Journal of Construction Engineering and Management 128 (2), 174-185, 2002
2002002
Early contractor involvement in design and its impact on construction schedule performance
L Song, Y Mohamed, SM AbouRizk
Journal of Management in Engineering 25 (1), 12-20, 2009
1812009
Utility-theory model for bid markup decisions
SP Dozzi, SM AbouRizk, SL Schroeder
Journal of construction Engineering and Management 122 (2), 119-124, 1996
1781996
A framework for applying simulation in construction
SM AbouRizk, D Hajjar
Canadian journal of civil engineering 25 (3), 604-617, 1998
1641998
Statistical properties of construction duration data
SM AbouRizk, DW Halpin
Journal of Construction Engineering and Management 118 (3), 525-544, 1992
1611992
Neural network model for estimating construction productivity
J Portas, S AbouRizk
Journal of construction engineering and management 123 (4), 399-410, 1997
1431997
Productivity in construction
SP Dozzi, SM AbouRizk
Institute for Research in Construction, National Research Council, 1993
1431993
Fitting beta distributions based on sample data
SM AbouRizk, DW Halpin, JR Wilson
Journal of Construction Engineering and Management 120 (2), 288-305, 1994
1381994
Risk-based life-cycle costing of infrastructure rehabilitation and construction alternatives
O Salem, S AbouRizk, S Ariaratnam
Journal of Infrastructure Systems 9 (1), 6-15, 2003
1292003
Measuring and modeling labor productivity using historical data
L Song, SM AbouRizk
Journal of Construction Engineering and Management 134 (10), 786-794, 2008
1242008
Resource-based modeling for construction simulation
J Shi, SM AbouRizk
Journal of construction engineering and management 123 (1), 26-33, 1997
1211997
Estimating labor production rates for industrial construction activities
S AbouRizk, P Knowles, UR Hermann
Journal of construction engineering and management 127 (6), 502-511, 2001
1172001
Developing a knowledge management system for improved value engineering practices in the construction industry
X Zhang, X Mao, SM AbouRizk
Automation in construction 18 (6), 777-789, 2009
1132009
Simphony-An integrated environment for construction simulation
S AbouRizk, Y Mohamed
2000 Winter Simulation Conference Proceedings (Cat. No. 00CH37165) 2, 1907-1914, 2000
1132000
Visual interactive fitting of beta distributions
SM AbouRizk, DW Halpin, JR Wilson
Journal of Construction Engineering and Management 117 (4), 589-605, 1991
1101991
Research in modeling and simulation for improving construction engineering operations
S AbouRizk, D Halpin, Y Mohamed, U Hermann
Journal of Construction Engineering and Management 137 (10), 843-852, 2011
1082011
The system can't perform the operation now. Try again later.
Articles 1–20