Follow
Iman Nosoohi
Title
Cited by
Cited by
Year
A multi-objective approach to simultaneous determination of spare part numbers and preventive replacement times
I Nosoohi, SR Hejazi
Applied Mathematical Modelling 35 (3), 1157-1166, 2011
702011
Outsource planning through option contracts with demand and cost uncertainty
I Nosoohi, AS Nookabadi
European Journal of Operational Research 250 (1), 131-142, 2016
532016
Designing a supply contract to coordinate supplier’s production, considering customer oriented production
I Nosoohi, AS Nookabadi
Computers & Industrial Engineering 74, 26-36, 2014
252014
Outsource planning with asymmetric supply cost information through a menu of option contracts
I Nosoohi, AS Nookabadi
International Transactions in Operational Research 26 (4), 1422-1450, 2019
162019
Urban planning with the aid of factor analysis approach: The case of Isfahan municipality
I Nosoohi, A Zeinal-Hamadani
Theoretical and Empirical Researches in Urban Management 6 (1), 56-69, 2011
142011
Posted price and name-your-own-price in a product line design problem
I Nosoohi
Journal of Retailing and Consumer Services 64, 2022
62022
A conceptual methodology for transportation projects selection
I Nosoohi, BSN SHETAB
INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION RESEARCH …, 2011
62011
Selection the Optimum Suppliers Compound Using a Mixed Model of MADM and Fault Tree Analysis
M Azimian, H Javadi, A Farshchiha, I Nosohi
Journal of Production and Operations Management 8 (1), 45-64, 2017
52017
Modeling of capacity reservation and supplier selection based on option contract
I Nosoohi, N Mollaverdi
International Journal of Industrial Engineering & Production Research 22 (2 …, 2011
42011
Approaches to designing the revenue sharing contract under asymmetric cost information
I Nosoohi, AS Nookabadi
IMA Journal of Management Mathematics 29 (1), 69-97, 2018
32018
Effects of Discount Scenarios on Chaotic Behavior of Inventory Level Under Price-Dependent Demand
I Nosoohi, J Parvizian
International Journal of System Dynamics Applications (IJSDA) 2 (3), 58-72, 2013
22013
C‌O‌N‌T‌R‌A‌C‌T D‌E‌S‌I‌G‌N I‌N A T‌H‌R‌E‌E-E‌C‌H‌E‌L‌O‌N S‌U‌P‌P‌L‌Y C‌H‌A‌I‌N, I‌N T‌H‌E C‌A‌S‌E O‌F I‌N‌F‌O‌R‌M‌A‌T‌I‌O‌N U‌N‌C‌E‌R‌T‌A‌I‌N‌T‌Y
I N‌o‌s‌o‌o‌h‌i, A S‌h‌a‌h‌a‌n‌d‌e‌h N‌o‌o‌k‌a‌b‌a‌d‌i, G M‌o‌s‌l‌e‌h‌i
Sharif Journal of Industrial Engineering & Management 33 (1.1), 29-40, 2017
2017
D‌E‌S‌I‌G‌N O‌F W‌H‌O‌L‌E‌S‌A‌L‌E P‌R‌I‌C‌E A‌N‌D R‌E‌V‌E‌N‌U‌E S‌H‌A‌R‌I‌N‌G C‌O‌N‌T‌R‌A‌C‌T‌S I‌N A T‌W‌O-E‌C‌H‌E‌L‌O‌N S‌U‌P‌P‌L‌Y C‌H‌A‌I‌N
I N‌o‌s‌o‌o‌h‌i, A S‌h‌a‌h‌a‌n‌d‌e‌h N‌o‌o‌k‌a‌b‌a‌d‌i, G M‌o‌s‌l‌e‌h‌i
Sharif Journal of Industrial Engineering & Management 33 (1.2), 13-22, 2017
2017
Contract design for increasing supplier's capacity, in a two-stage supply chain, with stochastic demand
I Nosoohi, AS Nookabadi
2008 IEEE International Conference on Service Operations and Logistics, and …, 2008
2008
The system can't perform the operation now. Try again later.
Articles 1–14